Category:Interstate 5 in Oregon
Jump to navigation
Jump to search
section of Interstate Highway in Oregon, United States | |||||
Upload media | |||||
Instance of | |||||
---|---|---|---|---|---|
Location | Oregon | ||||
Transport network | |||||
Owned by | |||||
Maintained by | |||||
Inception |
| ||||
Length |
| ||||
Terminus | |||||
| |||||
State highways in Oregon |
---|
3 · 5 · 6 · 7 · 8 · 10 · 11 · 18 |
I-5 · I-82 · I-84 · I-105 · I-205 · I-305 · I-405 · I-505 |
US-20 · US-26 · US-30 · US-95 · US-97 · US-101 · US-197 · US-199 · US-395 · US-730 |
English: This category should contain files related to Interstate 5 in Oregon.
English: Media related to Interstate 5 in Oregon, a 308.14-mile (495.90 km) section of Interstate Highway in Oregon, United States.
Subcategories
This category has the following 11 subcategories, out of 11 total.
1
- Interstate 105 (Oregon) (17 F)
3
- Interstate 305 (Oregon) (2 F)
4
5
- Interstate 505 (Oregon) (2 F)
C
F
- Fern Valley Interchange Project (11 F)
I
P
- Picnic on the Riverfront (4 F)
W
- Woodburn Interchange Project (12 F)
Media in category "Interstate 5 in Oregon"
The following 200 files are in this category, out of 289 total.
(previous page) (next page)-
'polka dot' deck on the East Main over I-5 bridge deck (51130367153).jpg 5,472 × 3,648; 10.08 MB
-
1 I 5ConcretePourSept27 (48832465423).jpg 4,000 × 3,000; 5.38 MB
-
2 Exit6BridgePour Aug10 2021 (51382828538).jpg 5,472 × 3,648; 6.28 MB
-
2 I 5ConcretePourSept272019 (48833001227).jpg 4,000 × 3,000; 5.62 MB
-
2 I-5 SB, Exit 6 NightPour Aug10 2021 (51381823912).jpg 1,332 × 884; 217 KB
-
2 MountainAve Ashland RamplocationJuly28 2021 (51353083156).jpg 5,472 × 3,648; 8.11 MB
-
2017-06-25 Portland skyline 01.jpg 4,032 × 3,024; 1.81 MB
-
2017-06-25 Portland skyline 02.jpg 4,032 × 1,377; 1.1 MB
-
2017-06-25 Portland skyline 03.jpg 4,032 × 3,024; 1.91 MB
-
3 I 5ConcretePourSept27 (48832831041).jpg 4,000 × 3,000; 5.93 MB
-
4-ramp-2 (52120756900).jpg 3,840 × 2,160; 1.6 MB
-
8-I5-6 (52120285303).jpg 3,840 × 2,160; 2 MB
-
8-I5-7 (52120504559).jpg 3,840 × 2,160; 2.19 MB
-
A line of trucks waits for a crash to clear (5495543382).jpg 1,020 × 677; 633 KB
-
A long and winding load (18905225911).jpg 4,912 × 1,080; 2.48 MB
-
Advisory speed on Interstate 5 (15035514552).jpg 3,600 × 2,403; 4.04 MB
-
Aerial Exit40 SBRamps&KaneCreek Feb172021 (50956340013).jpg 5,472 × 3,648; 10.41 MB
-
Aerial view of I-5 at Kuebler (5035968597).jpg 640 × 428; 69 KB
-
Aerial view of I-5 traffic traveling over the Medford Viaduct (21450626945).jpg 1,985 × 1,320; 1.94 MB
-
Albany crash (12350804885).jpg 1,792 × 1,344; 1.57 MB
-
APPROACHING INTERSTATE BRIDGE OVER THE COLUMBIA RIVER ON ROUTE 1-5 - NARA - 548084.jpg 2,008 × 3,000; 945 KB
-
Approaching stopped vehicles (51612685914).jpg 7,360 × 4,912; 6.98 MB
-
Approaching the exit (51611994470).jpg 7,360 × 4,912; 15.67 MB
-
Ashland clean up (31262248614).jpg 1,199 × 597; 95 KB
-
Attenuator (47973817143).jpg 3,680 × 2,456; 2.23 MB
-
Attenuator truck (35592948496).jpg 1,798 × 1,200; 2.59 MB
-
Attenuator truck (47973809462).jpg 3,680 × 2,456; 2.35 MB
-
B-1 on Interstate 5 (6344860765).jpg 4,288 × 2,848; 4.37 MB
-
Be prepared to put on chains (8292273914).jpg 1,600 × 1,200; 926 KB
-
Beam work (7415281734).jpg 2,100 × 1,395; 3.12 MB
-
Beaming in (7415283012).jpg 2,100 × 1,395; 3.58 MB
-
Bear Creek I-5 - Medford Oregon.jpg 3,000 × 4,000; 4.19 MB
-
Bent Cap Pour from ground, I-5 Glendale Bridges (51539595398).jpg 1,024 × 682; 131 KB
-
Bent Cap Pour, I-5 Glendale Bridge (51540276750).jpg 1,024 × 682; 120 KB
-
Blowing snow on I-5 at Exit 6 (51800135085).jpg 2,000 × 1,500; 961 KB
-
Bonita Road crossing I-5 (Beaverton, Oregon Historical Photo Gallery) (288).jpg 2,778 × 2,238; 847 KB
-
Boomer Hill Road - I-5 Douglas County (11274133585).jpg 2,560 × 1,920; 1.16 MB
-
Car crash on Interstate 5.jpg 2,592 × 1,399; 754 KB
-
Cascades POINT cruising up I-5 (21229642428).jpg 4,160 × 3,120; 3.1 MB
-
Chain checkpoint - cars (10442295496).jpg 2,272 × 1,704; 819 KB
-
Chain checkpoint - trucks (10442280004).jpg 2,272 × 1,704; 780 KB
-
Chaining up in shorts? (8291164617).jpg 1,600 × 1,200; 334 KB
-
Chaining up in travel lane (49128226518).jpg 5,472 × 3,648; 6.67 MB
-
Chains (12366180225).jpg 4,288 × 2,848; 3.4 MB
-
Chains required - trucker (32134396197).jpg 5,472 × 3,648; 5.66 MB
-
Clearing off the freeway (12351261384).jpg 2,560 × 1,920; 2.8 MB
-
Constructing the I-5 MP 17 Ashland emergency evacuation ramp. (51845211368).jpg 5,472 × 3,648; 7.54 MB
-
Crash on ramp (12351259924).jpg 2,560 × 1,920; 2.84 MB
-
Crowd gathers for WRB event (3811797203).jpg 1,600 × 1,200; 664 KB
-
Don't Drive Intexticated (33460411935).jpg 618 × 508; 278 KB
-
Douglas County Fairgrounds - I-5 Douglas County (11274241103).jpg 2,560 × 1,920; 896 KB
-
Drive with caution 12-15-08 (3111987736).jpg 2,816 × 2,112; 1.22 MB
-
East Portland (7848255574).jpg 5,040 × 7,560; 18.58 MB
-
Environmental protection efforts (13760882465).jpg 1,024 × 681; 130 KB
-
Eugene, Oregon 1955 Yellow Book.jpg 800 × 834; 171 KB
-
Exit Sign for US 199.JPG 4,320 × 3,240; 3.68 MB
-
Eyes On The Road (33077385600).jpg 1,024 × 732; 426 KB
-
Fine tuning (7415282000).jpg 2,100 × 1,395; 2.65 MB
-
Flower growing on I-5 overcrossing in Albany - Chris Weigel (11409426413).jpg 1,591 × 2,047; 2.17 MB
-
Getting around Eugene Franklin (52184907365).jpg 3,680 × 2,456; 1.07 MB
-
Getting around Eugene NB I-5 to I-105 (52183400477).jpg 3,680 × 2,456; 989 KB
-
Getting around Eugene NB I-5 to I-105 (52184432873).jpg 3,680 × 2,456; 1.08 MB
-
Getting around Eugene SB I-5 to I-105 (52183561532).jpg 3,680 × 2,456; 957 KB
-
Getting around Eugene SB I-5 to I-105 (52184839374).jpg 3,680 × 2,456; 980 KB
-
I 5 BridgesOverRRHwy 2 Oct28 2019 (48981918242).jpg 5,472 × 3,648; 9.66 MB
-
I 5 California border to Ashland project area (48190164617).jpg 1,705 × 481; 310 KB
-
I 5 LelandRoadUnderpass (51161432600).jpg 5,472 × 3,648; 6.31 MB
-
I 5 MountainAve July30 2021 (51353824349).jpg 1,732 × 1,154; 9.4 MB
-
I 5 MountainAve LookingSWtowardAshlandJuly30 2021 (51352343722).jpg 1,732 × 1,154; 8.21 MB
-
I 5 MountainAveLkgNWJuly30 2021 (51354106655).jpg 5,472 × 3,648; 8.86 MB
-
I 5 MP 64 NB (36158737413).jpg 1,127 × 793; 172 KB
-
I 5 TruckInSingleLaneWZ MtShasta (51140869968).jpg 5,472 × 3,648; 6.61 MB
-
I 5 Welcome to Oregon sign (48190111051).jpg 640 × 960; 300 KB
-
I- Exit 6 northbound bridge pour aerial July7220 (50087439087).jpg 4,056 × 3,040; 7.14 MB
-
I-5 (OR).svg 601 × 601; 20 KB
-
I-5 30th - LCC (52127566323).jpg 5,472 × 3,648; 9.23 MB
-
I-5 30th interchange (52127564303).jpg 5,472 × 3,648; 9.46 MB
-
I-5 and 30th interchange (52128031865).jpg 5,472 × 3,648; 9.6 MB
-
I-5 and I-217 (52957005349).jpg 6,000 × 4,000; 14.53 MB
-
I-5 and I-217 (52957314993).jpg 5,472 × 3,078; 6.97 MB
-
I-5 as it runs through the Willamette Valley (51269494472).jpg 5,472 × 3,648; 7.42 MB
-
I-5 at Barton Road (52889532822).jpg 4,000 × 3,000; 2.49 MB
-
I-5 at Millersburg tandem plows.webm 12 s, 404 × 720; 1.48 MB
-
I-5 at MP 53 Aug. 18, 2017 (36967662315).jpg 800 × 600; 163 KB
-
I-5 at Roberts Mountain (32944906140).jpg 1,250 × 700; 383 KB
-
I-5 at Sexton Summit (50888204521).jpg 960 × 720; 739 KB
-
I-5 Barnett Road Bridge Deck (25769249557).jpg 5,472 × 3,648; 10.39 MB
-
I-5 bridge over Leland Road work zone (49898579341).jpg 5,472 × 3,648; 6.84 MB
-
I-5 bridge repair under traffic (50095635097).jpg 946 × 640; 186 KB
-
I-5 Bridges over Rogue River from downstream (48981230293).jpg 5,472 × 3,648; 8.65 MB
-
I-5 Bridges Over Rogue River looking SB (48981731251).jpg 4,056 × 3,040; 4.51 MB
-
I-5 CA Border to Ashland Paving (48727546277).jpg 4,056 × 3,040; 3.89 MB
-
I-5 clear zone near Glendale (52890113301).jpg 4,000 × 3,000; 2.42 MB
-
I-5 climbing lane construction on Roberts Mountain (50094967928).jpg 2,250 × 1,500; 1.6 MB
-
I-5 construction on Roberts Mountain (50095534646).jpg 2,250 × 1,500; 1.54 MB
-
I-5 Enchanted Way (30857212523).jpg 5,312 × 2,988; 4.24 MB
-
I-5 Equipment (12366631764).jpg 4,288 × 2,848; 3.2 MB
-
I-5 Exit 14 Chain up queue.jpg 1,533 × 1,481; 385 KB
-
I-5 Exit 27 looking NNEApril12 2021 (51126750810).jpg 5,472 × 3,648; 8.71 MB
-
I-5 Exit 27 south Medford interchange (51125374277).jpg 1,632 × 1,088; 1.34 MB
-
I-5 Exit 27, south Medford interchange (51125688959).jpg 640 × 960; 392 KB
-
I-5 Exit 27, south Medford interchange (51125937161).jpg 400 × 600; 143 KB
-
I-5 Exit 30 IAMP Study Area (50642199448).jpg 1,894 × 1,056; 522 KB
-
I-5 Exit 30 looking northwest 2013 (50642169323).jpg 1,279 × 853; 593 KB
-
I-5 Exit 30 north Medford interchange area (50642925161).jpg 1,800 × 1,203; 1.67 MB
-
I-5 Exit 58 Grants Pass 1963 (48920439503).png 935 × 626; 732 KB
-
I-5 Exit 58, 7th Street Bridge (51538565702).jpg 1,667 × 1,031; 336 KB
-
I-5 Exit 58, Scoville Rd Bridge (51539352451).jpg 1,773 × 1,182; 327 KB
-
I-5 Exit 6 bridge deck under construction (49971374803).jpg 5,472 × 3,648; 11.09 MB
-
I-5 Exit 6 bridge deck under construction (49971890746).jpg 5,086 × 2,567; 4.25 MB
-
I-5 Exit 6 bridge deck work under construction (49971890491).jpg 5,427 × 2,982; 5.22 MB
-
I-5 Exit 6 bridge pour looking west July7 (50087437872).jpg 4,056 × 3,040; 6.72 MB
-
I-5 Exit 6 Bridge Pour Top DownviewAug102021 (51382829743).jpg 5,471 × 3,307; 4.8 MB
-
I-5 Exit 6 interchange with ODOT 'Upper Shed' (48190110986).jpg 1,279 × 853; 567 KB
-
I-5 Exit 6 is covered in snow (51753593543).jpg 4,032 × 3,024; 1.18 MB
-
I-5 Exit 6 NB Bridge Repair Sept. 2, 2020 (50299260202).jpg 1,280 × 959; 311 KB
-
I-5 Exit 6 NB Bridge Repair Sept. 2, 2020 (50299260272).jpg 1,280 × 959; 333 KB
-
I-5 Exit 6 northbound bridge completed, Oct. 2020te Oct15 2020 (50533144063).jpg 1,329 × 834; 490 KB
-
I-5 Exit 6 northbound bridge pour July 7 2020 (50087204231).jpg 5,427 × 2,634; 1.51 MB
-
I-5 Exit 80 Glendale Bridges April 27, 2021 (51161111474).jpg 5,472 × 3,648; 9.63 MB
-
I-5 Exit near LCC Campus (52127559793).jpg 5,472 × 3,648; 9.12 MB
-
I-5 Fern Valley Intechange 4 (38387790002).jpg 1,752 × 640; 191 KB
-
I-5 Fern Valley Interchange (24547880958).jpg 2,798 × 1,866; 1.36 MB
-
I-5 Fern Valley Interchange (38387790042).jpg 1,362 × 922; 582 KB
-
I-5 Fern Valley Interchange 1 (38387791242).jpg 4,076 × 2,717; 2.34 MB
-
I-5 Fern Valley Interchange 5 Bikelanes (38363306746).jpg 1,280 × 853; 236 KB
-
I-5 Glendale Bridge Pour (51540276720).jpg 1,024 × 682; 158 KB
-
I-5 Harvard interchange (Exit 124) (43636212924).jpg 2,000 × 1,500; 1.08 MB
-
I-5 hazard tree removal near Glendale (52890565783).jpg 2,000 × 1,500; 1.19 MB
-
I-5 Hillcrest Road Bridge Grants Pass retrofit (50094514091).jpg 5,472 × 3,648; 8.06 MB
-
I-5 in Lane County, Oregon.jpg 2,816 × 2,112; 1.07 MB
-
I-5 in Oregon with Mt. Shasta in the background (46372360921).jpg 1,193 × 1,276; 1.05 MB
-
I-5 Leland Road expanded spread footing (49898886997).jpg 3,648 × 5,472; 5.62 MB
-
I-5 looking north toward Emigrant Lake (48190164382).jpg 800 × 1,200; 473 KB
-
I-5 Medford Viaduct, looking northwest (40640115871).jpg 1,024 × 683; 330 KB
-
I-5 Medford Viaduct, Southbound traffic (40640116571).jpg 2,840 × 1,227; 1.37 MB
-
I-5 MP 17 Mountain Ave. evacuation ramp nears completion. (51844153772).jpg 5,472 × 3,648; 7.61 MB
-
I-5 MP 7 CORP restle (48190110896).jpg 640 × 960; 345 KB
-
I-5 NB at MP 64 (36827655291).jpg 535 × 503; 60 KB
-
I-5 NB Exit 6 south of Ashland (51799528428).jpg 1,024 × 768; 172 KB
-
I-5 NB WorkZone Note Mt.Shasta in Bkg April23 2021 (51141759745).jpg 5,472 × 3,648; 6.47 MB
-
I-5 near California border.jpg 961 × 674; 187 KB
-
I-5 near Eugene (51800087126).jpg 1,600 × 1,200; 1.02 MB
-
I-5 North - MM140 (31131278196).jpg 2,400 × 1,600; 1.61 MB
-
I-5 North Medford interchange area, 2013 (50642925276).jpg 1,279 × 853; 595 KB
-
I-5 north of Albany (5495543436).jpg 677 × 1,020; 719 KB
-
I-5 northbound at Blackwell Hill SW Oregon (47223233491).jpg 1,200 × 900; 478 KB
-
I-5 northbound at Exit 6 (51753359096).jpg 4,032 × 3,024; 3.72 MB
-
I-5 Northbound between Salem OR and Portland OR.png 2,208 × 1,242; 2.86 MB
-
I-5 northbound bridges over the Rogue River (48981918287).jpg 5,472 × 3,648; 8.33 MB
-
I-5 Northbound junction with I-84 Eastbound.jpg 1,255 × 975; 260 KB
-
I-5 northbound loop ramp at Woodburn (15573567910).jpg 3,456 × 1,944; 2.23 MB
-
I-5 Oregon near MP2 looking North (48190110781).jpg 1,243 × 784; 268 KB
-
I-5 over 26th Avenue (53568094545).jpg 2,456 × 3,680; 2.64 MB
-
I-5 over Leland Road Bridges Shear Blocks (49898886407).jpg 5,472 × 3,648; 5.38 MB
-
I-5 paving near Azalea (52889547567).jpg 4,000 × 3,000; 2.94 MB
-
I-5 ramp at Quines Creek (52890254469).jpg 4,000 × 3,000; 3.39 MB
-
I-5 Roberts Mountain pass (32807772895).jpg 375 × 211; 80 KB
-
I-5 rockfall (33017103016).jpg 4,032 × 3,024; 2.97 MB
-
I-5 Rolling slowdown NB July 30, 2019 (48417436076).jpg 3,921 × 2,197; 1.32 MB
-
I-5 SB end of two mile lane closure (48727628697).jpg 2,812 × 2,053; 1.72 MB
-
I-5 Siskiyou Pass (5202124186).jpg 328 × 314; 17 KB
-
I-5 Siskiyou Pass Jan. 18 (6726269863).jpg 2,048 × 1,536; 1.12 MB
-
I-5 Siskiyou Pass.jpg 835 × 872; 132 KB
-
I-5 Siskiyou Rest Area Welcome Center looking south (35663808050).jpg 5,472 × 3,648; 6.25 MB
-
I-5 Siskiyou Summit chain control (49128227078).jpg 5,472 × 3,648; 5.16 MB
-
I-5 Siskiyou Summit Oregon (48190110691).jpg 605 × 625; 96 KB
-
I-5 Siskiyou Summit southbound (49128900292).jpg 5,472 × 3,648; 4.73 MB
-
I-5 Siskiyous at Exit 1 NB (48190164567).jpg 1,271 × 868; 358 KB
-
I-5 Siskiyous looking south to Mt. Shasta (48190108911).jpg 603 × 785; 120 KB
-
I-5 Siskiyous.jpg 914 × 530; 71 KB
-
I-5 southbound chain control (49128226673).jpg 5,472 × 3,648; 6.05 MB
-
I-5 southbound smart work zone Bluetooth near Ashland (48374385727).jpg 5,472 × 3,648; 6.95 MB
-
I-5 southbound transition looking north to Exit 11. (48727630942).jpg 3,326 × 1,782; 1.86 MB
-
I-5 Traffic through Salem 12-15-08 (3111156613).jpg 1,600 × 1,200; 509 KB
-
I-5 wild ride (32881959598).jpg 2,482 × 1,578; 2 MB
-
I-5 winter 'sentinal' (49128716341).jpg 1,000 × 750; 672 KB
-
I-5- Anlauf to Elkhead Paving Project (32561425300).jpg 1,000 × 750; 433 KB
-
I5inPortlandNight.jpg 3,044 × 1,826; 1.28 MB
-
Icy approach 12-15-08 (3111987964).jpg 2,816 × 2,112; 1.16 MB
-
Icy roads slow traffic (5495543782).jpg 1,020 × 677; 811 KB
-
Installing overhead signs on I-5 (52564551708).jpg 5,472 × 3,648; 8.89 MB
-
Interstate 5 at Belmont - Portland, Oregon.jpg 2,223 × 2,467; 1.99 MB
-
Interstate 5 at Belmont close - Portland, Oregon.jpg 2,563 × 1,890; 1.78 MB
-
Interstate 5 at milepost 162 (11272879054).jpg 3,264 × 1,836; 1.36 MB
-
Interstate 5 at Oregon Border (5202124284).jpg 352 × 240; 16 KB
-
Interstate 5 at Seven Oaks (3574326090).jpg 2,272 × 1,704; 875 KB
-
Interstate 5 Bridge Demo over OR 273 (51240359386).jpg 1,280 × 959; 270 KB
-
Interstate 5 Bridge Demo over OR 273 (51240558843).jpg 1,280 × 959; 301 KB
-
Interstate 5 conditions at exit 162 (11272926063).jpg 1,600 × 1,200; 505 KB
-
Interstate 5 Exit 6 Bridge Demolition (51239649762).jpg 1,280 × 959; 281 KB
-
Interstate 5 Northbound junction with I-405 south of Downtown Portland.jpg 1,141 × 966; 204 KB
-
Interstate 5 south of Ashland, single lane traffic July23 2021 (51330821346).jpg 5,472 × 3,648; 6.43 MB