File:KSC-05-S-00110 (ksc 051605 sssr).webm

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

KSC-05-S-00110_(ksc_051605_sssr).webm(WebM audio/video file, VP9/Opus, length 3 min 45 s, 320 × 212 pixels, 343 kbps overall, file size: 9.17 MB)

Captions

Captions

Now on the NASA Space Shuttle Status Report: In the Works_ NASA lays out its plan to return to flight this July_ Plus: Tank tasks_ A test, and a swap of the Shuttles' fuel tanks are on the horizon.

Summary[edit]

Description
English: Now on the NASA Space Shuttle Status Report: In the Works_ NASA lays out its plan to return to flight this July_ Plus: Tank tasks_ A test, and a swap of the Shuttles' fuel tanks are on the horizon. And, Preparations for a September launch for Atlantis. The NASA Space Shuttle Status Report starts right now_ I’m Randy Wade, NASA test director at Kennedy Space Center in Florida, and this is the NASA Space Shuttle Status Report. With a new launch window set for STS-114, NASA announced a plan to return to flight this July. First, on Discovery, preparations are under way for a tanking test set for mid next week to continue troubleshooting two issues that arose during the April 14 tanking test. Engineers are evaluating the liquid hydrogen sensors in the tank that gave intermittent readings during that test. These sensors serve as fuel gauges, signaling the Space Shuttle Main Engines to shut down when propellants reach a certain level in the tank. Engineers are continuing to evaluate a liquid hydrogen pressurization relief valve that cycled more times during the tanking test than is standard. Following the tanking test, technicians will begin preparations to roll Space Shuttle Discovery back to the Vehicle Assembly Building. Once in the VAB, orbiter Discovery most likely will be removed from its External Tank, lowered into the transfer aisle and later attached to the External Tank and Solid Rocket Boosters presently scheduled to fly with orbiter Atlantis on STS-121. Technicians have replaced diffusers on ET-121's liquid oxygen and liquid hydrogen tanks. The tank is scheduled to be attached to its Solid Rocket Boosters next week. A new heater will also be added to the feedline bellows on that tank to minimize the potential for ice and frost buildup. Atlantis will likely fly with ET-119. That External Tank is scheduled to arrive at Kennedy next month. Speaking of Atlantis, processing continues in Orbiter Processing Facility bay 1 for its mission to the International Space Station. Vehicle power-up testing is about 70 percent complete, and closeouts continue in the forward and aft areas of the orbiter. On May 11, workers performed step and gap laser testing on the Thermal Protection System. The laser checks the tiles to ensure they are properly installed at the correct distance and height from each adjacent tile. A new Thermal Protection System seal has also been added in the nose and main landing gear doors. Technicians performed cycles by raising and lowering the gear to check the doors for the proper clearance and seal compression. Atlantis is set to launch in September. That’s all the time we have for this week’s Space Shuttle Status Report. Remember, July 13 to July 31, 2005, is NASA’s new window for Space Shuttle Discovery’s Return to Flight mission, designated STS-114 to the International Space Station_ Until next time, log on to nasa.gov for the latest in Return to Flight and NASA mission news. I’m Randy Wade for the NASA Space Shuttle Status Report.
Date Taken on 16 May 2005
Source
This image or video was catalogued by Kennedy Space Center of the United States National Aeronautics and Space Administration (NASA) under Photo ID: ksc_051605_sssr.

This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.
Other languages:
Author NASA Kennedy Space Center
Keywords
InfoField
Return_to_Flight; RTF; Space_Shuttle; tanking_test; Discovery; processing; launch; Atlantis; ET

Licensing[edit]

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current03:22, 10 May 20243 min 45 s, 320 × 212 (9.17 MB)OptimusPrimeBot (talk | contribs)Imported media from http://images-assets.nasa.gov/video/ksc_051605_sssr/ksc_051605_sssr~orig.mp4

The following page uses this file:

Transcode status

Update transcode status
Format Bitrate Download Status Encode time
VP9 240P 227 kbps Completed 04:35, 10 May 2024 1 min 34 s
Streaming 240p (VP9) 121 kbps Completed 04:35, 10 May 2024 1 min 4 s
WebM 360P 445 kbps Completed 04:35, 10 May 2024 28 s
Streaming 144p (MJPEG) 743 kbps Completed 04:34, 10 May 2024 4.0 s
Stereo (Opus) 88 kbps Completed 04:35, 10 May 2024 5.0 s
Stereo (MP3) 128 kbps Completed 04:35, 10 May 2024 5.0 s

Metadata