File:VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6-7-68) - Rocky Flats Plant, Final Assembly and Shipping, Eastern portion of plant site, south HAER COLO,30-GOLD.V,1U-3.tif
Jump to navigation
Jump to search
Size of this JPG preview of this TIF file: 751 × 599 pixels. Other resolutions: 301 × 240 pixels | 601 × 480 pixels | 962 × 768 pixels | 1,280 × 1,022 pixels | 2,560 × 2,043 pixels | 5,000 × 3,991 pixels.
Original file (5,000 × 3,991 pixels, file size: 19.03 MB, MIME type: image/tiff)