File:Final environmental impact statement Imperial Valley Solar Project (IA finalenvironment01elce).pdf

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search
Go to page
next page →
next page →
next page →

Original file(637 × 822 pixels, file size: 190.67 MB, MIME type: application/pdf, 1,006 pages)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Final environmental impact statement Imperial Valley Solar Project   (Wikidata search (Cirrus search) Wikidata query (SPARQL)  Create new Wikidata item based on this file)
Author
United States. Bureau of Land Management. El Centro Field Office
image of artwork listed in title parameter on this page
Title
Final environmental impact statement Imperial Valley Solar Project
Volume 1
Publisher
[El Centro, Calif.] U.S. Dept. of the Interior, Bureau of Land Management, El Centro Field Office
Description
"July 2010"
Mode of access: World Wide Web
"BLM/CA/ES-2010-012+1793"--Title page verso
"FES 10-29"--Title page verso
This Final Environmental Impact Statement (FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction and operation of a solar electricity generation facility. The Agency Preferred Alternative covers approximately 6,144 acres (ac), managed by the BLM, and would generate 709 megawatts (MW) of electricity annually. The FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources, cultural resources, land use, visual resources, and hydrology, water quality, and water use. Many of these adverse impacts can be avoided or substantially reduced based on compliance with applicable laws, ordinances, regulations and standards, and compliance with measures provided in this FEIS
System requirements: Adobe Acrobat Reader
Includes bibliographic references
volume 1 : Signature page through Chapter 11, Glossary -- volume 2 : Appendices A through I

Subjects: Solar power plants; Electric power transmission; Public lands; Solar power plants; Electric power transmission 
Language English
Publication date 2013
Current location
IA Collections: blmlibrary; fedlink; americana
Accession number
finalenvironment01elce
Authority file  OCLC: 900797398
Source
Internet Archive identifier: finalenvironment01elce
https://archive.org/download/finalenvironment01elce/finalenvironment01elce.pdf

Licensing[edit]

Public domain
This work is in the public domain in the United States because it is a work prepared by an officer or employee of the United States Government as part of that person’s official duties under the terms of Title 17, Chapter 1, Section 105 of the US Code. Note: This only applies to original works of the Federal Government and not to the work of any individual U.S. state, territory, commonwealth, county, municipality, or any other subdivision. This template also does not apply to postage stamp designs published by the United States Postal Service since 1978. (See § 313.6(C)(1) of Compendium of U.S. Copyright Office Practices). It also does not apply to certain US coins; see The US Mint Terms of Use.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current13:15, 20 July 2020Thumbnail for version as of 13:15, 20 July 2020637 × 822, 1,006 pages (190.67 MB) (talk | contribs)FEDLINK - United States Federal Collection finalenvironment01elce (User talk:Fæ/IA books#Fork8) (batch 1993-2020 #16487)

Metadata