Category:United States photographs taken on 2021-07-07
Jump to navigation
Jump to search
Countries of North America: Canada · Mexico · United States of America‡
‡: partly located in North America
‡: partly located in North America
← | 7 July 2021 | → | ||
← | July 2021 | → | ||
United States of America photographs taken on 7 July 2021.
Image files should be categorized here automatically using {{taken on}} template. Direct categorisation is also possible, if automatic is impossible.
Subcategories
This category has only the following subcategory.
N
Media in category "United States photographs taken on 2021-07-07"
The following 190 files are in this category, out of 190 total.
-
A Feral Chicken on Kauai,Hawaii - a Rooster.jpg 3,573 × 2,382; 4.62 MB
-
Amanita fulva 141911994.jpg 1,638 × 2,048; 1.16 MB
-
Amanita rubescens 141912099.jpg 2,048 × 1,638; 1.41 MB
-
Ambystoma tigrinum 141822003.jpg 1,536 × 2,048; 2.5 MB
-
Astylopsis sexguttata 154714929.jpg 1,152 × 1,536; 555 KB
-
Ball Square station construction, July 2021.jpg 4,032 × 3,024; 5.59 MB
-
Ball Square station headhouse construction, July 2021.jpg 2,146 × 1,610; 1.63 MB
-
Ball Square station platform construction, July 2021.jpg 3,462 × 2,604; 2.88 MB
-
Ball Square station upper entrance construction, July 2021.jpg 3,602 × 2,699; 4.42 MB
-
Ball Square substation construction, July 2021.jpg 3,882 × 2,914; 5.51 MB
-
Beckwourth Complex - 2021 07 07-15.24.05.875-CDT.jpg 2,067 × 1,170; 191 KB
-
Beckwourth Complex - 2021 07 07-18.41.50.116-CDT.jpg 2,084 × 1,170; 95 KB
-
Bus lane on Washington Street approaching Union Square, July 2021.jpg 4,032 × 3,024; 7.08 MB
-
Catenary structure on GLX viaduct, July 2021.JPG 4,238 × 3,181; 1.59 MB
-
Charles River Dam locks, July 2021.jpg 4,032 × 3,024; 5.59 MB
-
City Square Tunnel ventilation structure, July 2021.jpg 4,032 × 3,024; 5.58 MB
-
Closed entrance to McCarthy Overpass tunnel, July 2021.jpg 4,032 × 3,024; 6.61 MB
-
Closed Somerville Avenue off-ramp from McCarthy Overpass, July 2021.jpg 4,032 × 3,024; 7.88 MB
-
Coccinella transversoguttata.jpg 1,124 × 1,689; 996 KB
-
Construction at Kendall MIT inbound headhouse, July 2021.jpg 4,032 × 3,024; 6 MB
-
Construction at Kendall MIT outbound headhouse, July 2021.jpg 3,787 × 2,839; 3.09 MB
-
Construction in Temple Place exit, July 2021.jpg 3,822 × 2,864; 3.49 MB
-
Construction material storage in Winter Street Concourse, July 2021.jpg 4,032 × 3,024; 3.95 MB
-
Craterellus foetidus (Pennsylvania, USA) 1.jpg 2,048 × 2,048; 1.68 MB
-
Craterellus foetidus (Pennsylvania, USA) 2.jpg 2,048 × 1,638; 1.08 MB
-
Craterellus foetidus (Pennsylvania, USA) 3.jpg 2,048 × 1,638; 943 KB
-
D2.3 and Union Square station construction, July 2021.jpg 4,032 × 3,024; 6.61 MB
-
East side of Community College station headhouse, July 2021.jpg 4,032 × 3,024; 4.79 MB
-
East Somerville station construction from Cross Street, July 2021.JPG 2,878 × 2,159; 1.31 MB
-
East Somerville station construction from Joy Street, July 2021.JPG 4,169 × 3,129; 2.18 MB
-
Elevator shafts under construction at Medford Tufts station, July 2021.jpg 4,032 × 3,024; 5.81 MB
-
Emergency exit stairs under construction at Medford Tufts station (1), July 2021.jpg 4,032 × 3,024; 7.15 MB
-
Etorofus anthracinus.jpg 958 × 719; 268 KB
-
Ferry dock at Lovejoy Wharf, July 2021.jpg 4,032 × 3,024; 6.01 MB
-
Galvin Memorial Park, July 2021.jpg 4,032 × 3,024; 9.94 MB
-
Ghost ramps near City Square, July 2021.jpg 4,032 × 3,024; 3.75 MB
-
Gilman Square station under construction, July 2021.JPG 4,773 × 3,580; 3.52 MB
-
GLX Transportation Building under construction, July 2021.jpg 4,032 × 3,024; 5.99 MB
-
GLX viaduct south of Lechmere Square, July 2021.jpg 4,032 × 3,024; 6.01 MB
-
GLX VMF under construction (1), July 2021.jpg 4,032 × 3,024; 5.79 MB
-
GLX VMF under construction (2), July 2021.jpg 4,032 × 3,024; 5.72 MB
-
Grand Junction Branch from Squires Bridge, July 2021.jpg 4,032 × 3,024; 6.63 MB
-
Haverhill Line train north of Prison Point Bridge, July 2021.jpg 4,032 × 3,024; 7.01 MB
-
High Line bridge from 3rd Avenue, July 2021.jpg 4,032 × 3,024; 7.24 MB
-
House at 323 River Street, Depew, New York - 20210707.jpg 2,052 × 1,539; 1.35 MB
-
Inbound Orange Line train entering Charles River tunnel portal, July 2021.jpg 4,032 × 3,024; 4.76 MB
-
Interlocking construction south of College Avenue, July 2021.jpg 3,932 × 2,949; 6.28 MB
-
Landsat 9 Spacecraft Arrival (Observatory) (KSC-20210707-PH-RNB01 0077).jpg 6,000 × 4,000; 15.72 MB
-
Landsat 9 Spacecraft Arrival (Observatory) (KSC-20210707-PH-RNB01 0108).jpg 6,000 × 4,000; 25.51 MB
-
Lechmere station under construction, July 2021.jpg 4,032 × 3,024; 5.93 MB
-
Lechmere Viaduct rehabilitation work, July 2021.jpg 4,032 × 3,024; 5.58 MB
-
Leymus innovatus 142954505.jpg 1,536 × 2,048; 1.25 MB
-
Leymus innovatus 142954527.jpg 1,536 × 2,048; 593 KB
-
Lowell Line train passing Ball Square station construction, July 2021.JPG 5,184 × 3,888; 3.9 MB
-
Lowell Line train passing Medford Branch construction, July 2021.jpg 4,032 × 3,024; 4.22 MB
-
Magoun Square station construction from Cedar Street, July 2021.JPG 4,239 × 3,181; 2.82 MB
-
Magoun Square station construction from Lowell Street (1), July 2021.JPG 4,047 × 3,046; 2.17 MB
-
Magoun Square station construction from Lowell Street (2), July 2021.jpg 3,517 × 2,639; 3.54 MB
-
Magoun Square station construction from Lowell Street (3), July 2021.jpg 4,032 × 3,024; 7.14 MB
-
Magoun Square station headhouse construction (1), July 2021.jpg 4,032 × 3,024; 8.46 MB
-
Magoun Square station headhouse construction (2), July 2021.jpg 4,032 × 3,024; 9.16 MB
-
Manchester-Boston Airport departure gates 2.jpg 4,608 × 3,456; 4.76 MB
-
Manchester-Boston Airport departure gates 3.jpg 4,608 × 3,456; 4.75 MB
-
Manchester-Boston Airport departure gates.jpg 4,608 × 3,456; 3.79 MB
-
MBTA 1032 leaving North Station, July 2021.JPG 5,184 × 3,888; 3.24 MB
-
MBTA route 1 bus south of Lafayette Square, July 2021.jpg 4,032 × 3,024; 6.56 MB
-
MBTA route 111 bus on New Rutherford Avenue, July 2021.jpg 2,489 × 1,869; 2.25 MB
-
MBTA route 80 bus on Squires Bridge, July 2021.jpg 4,032 × 3,024; 6.23 MB
-
MBTA route 86 bus in Union Square, July 2021.jpg 4,032 × 3,024; 6.24 MB
-
MBTA route 91 bus on Washington Street, July 2021.jpg 4,032 × 3,024; 5.47 MB
-
Medford Branch construction north of Central Street, July 2021.jpg 3,432 × 2,574; 3.2 MB
-
Medford Branch construction north of McGrath Highway, July 2021.jpg 4,032 × 3,024; 7.2 MB
-
Medford Branch construction south of Cedar Street, July 2021.jpg 4,032 × 3,024; 6.45 MB
-
Medford Branch construction south of Central Street, July 2021.jpg 4,032 × 3,024; 5.02 MB
-
Medford Branch construction south of Cross Street, July 2021.jpg 4,032 × 3,024; 6.32 MB
-
Medford Branch construction south of Lowell Street, July 2021.jpg 4,032 × 3,024; 6.99 MB
-
Medford Branch construction south of McGrath Highway, July 2021.jpg 4,032 × 3,024; 6.07 MB
-
Medford Branch construction south of Sycamore Street, July 2021.jpg 4,032 × 3,024; 4.73 MB
-
Medford Branch construction south of Walnut Street, July 2021.jpg 4,032 × 3,024; 6.58 MB
-
Medford Tufts station construction from Boston Avenue, July 2021.jpg 2,480 × 1,864; 1.52 MB
-
Medford Tufts station construction from Dowling Hall, July 2021.jpg 3,742 × 2,809; 5.56 MB
-
Millers River under highway ramps, July 2021.jpg 3,977 × 2,654; 3.45 MB
-
Mouth of Millers River, July 2021.jpg 4,032 × 3,024; 3.95 MB
-
Nanty Glo (1 of 1).jpg 3,996 × 1,439; 950 KB
-
Neoclinus blanchardi 141837191.jpg 1,647 × 2,048; 1.95 MB
-
Neoclinus blanchardi 141837334.jpg 1,536 × 2,048; 1.63 MB
-
New footbridge at Medford Tufts station, July 2021.jpg 4,032 × 3,024; 6.02 MB
-
New terrazzo flooring at North Station, July 2021.jpg 4,032 × 3,024; 4.07 MB
-
New Yard 10 lead connection to Lowell Line, July 2021.JPG 4,677 × 3,509; 3.26 MB
-
North headhouse under construction at Lechmere station, July 2021.jpg 4,032 × 3,024; 3.95 MB
-
North Station drawbridges and temporary tower, July 2021.jpg 3,507 × 2,634; 3.24 MB
-
North Station from the north, July 2021.JPG 4,581 × 3,056; 2.45 MB
-
Northbound Green Line train at Park Street station (1), July 2021.jpg 4,032 × 3,024; 3.85 MB
-
Northbound Green Line train at Park Street station (2), July 2021.jpg 3,887 × 2,919; 4.04 MB
-
Outbound fare lobby at Kendall MIT station, July 2021.jpg 3,961 × 2,974; 3.11 MB
-
Outbound Red Line train leaving Central station, July 2021.jpg 4,032 × 3,024; 3.21 MB
-
P20210707AS-2134 (51361796638).jpg 3,000 × 2,000; 1.65 MB
-
Passion flower - Arlington, MA - 01.jpg 2,815 × 2,815; 2.43 MB
-
Pearl Street substation under construction, July 2021.jpg 4,032 × 3,024; 3.48 MB
-
Plaza under construction at Lechmere station, July 2021.jpg 4,032 × 3,024; 3.5 MB
-
Press Conference (51296091657).jpg 6,016 × 4,016; 24.7 MB
-
Press Conference (51296092462).jpg 6,016 × 4,016; 25.17 MB
-
Press Conference (51296096797).jpg 5,051 × 3,372; 15.73 MB
-
Press Conference (51296098522).jpg 6,016 × 4,016; 26.97 MB
-
Press Conference (51296099457).jpg 6,016 × 4,016; 24.13 MB
-
Press Conference (51296830686).jpg 6,016 × 4,016; 25.36 MB
-
Press Conference (51296831831).jpg 6,016 × 4,016; 25.13 MB
-
Press Conference (51296832786).jpg 5,020 × 4,016; 21.16 MB
-
Press Conference (51297011028).jpg 6,016 × 4,016; 23.2 MB
-
Press Conference (51297011633).jpg 5,020 × 4,016; 20.35 MB
-
Press Conference (51297013688).jpg 6,016 × 4,016; 24.85 MB
-
Press Conference (51297017723).jpg 6,016 × 4,016; 24.19 MB
-
Press Conference (51297022833).jpg 4,518 × 3,614; 15.89 MB
-
Press Conference (51297542044).jpg 6,016 × 4,016; 23.05 MB
-
Press Conference (51297551354).jpg 6,016 × 4,016; 27.3 MB
-
Press Conference (51297552354).jpg 6,016 × 4,016; 26.56 MB
-
Press Conference (51297553319).jpg 2,391 × 3,581; 9.73 MB
-
Press Conference (51297558064).jpg 4,345 × 2,896; 11.67 MB
-
Press Conference (51297558394).jpg 5,568 × 3,712; 21.12 MB
-
Press Conference (51297559279).jpg 4,246 × 2,831; 11.59 MB
-
Press Conference (51297559789).jpg 3,342 × 2,674; 9.51 MB
-
Press Conference (51297839320).jpg 6,016 × 4,016; 23.53 MB
-
Press Conference (51297840095).jpg 3,851 × 2,571; 9.03 MB
-
Press Conference (51297843055).jpg 6,016 × 4,016; 24.4 MB
-
Press Conference (51297849595).jpg 5,325 × 3,555; 20.38 MB
-
Press Conference (51297851150).jpg 6,016 × 4,016; 24.59 MB
-
Red Bridge viaduct construction from Squires Bridge (1), July 2021.jpg 4,032 × 3,024; 5.49 MB
-
Red Bridge viaduct construction from Squires Bridge (2), July 2021.JPG 2,627 × 1,973; 1.14 MB
-
Red Bridge viaduct construction from Squires Bridge (3), July 2021.jpg 3,722 × 2,789; 5.79 MB
-
Red Bridge viaduct construction from the north, July 2021.jpg 4,264 × 2,123; 2.62 MB
-
Ricardo Pinto (51298168354) (cropped).jpg 1,231 × 1,428; 521 KB
-
Ricardo Pinto (51298168354).jpg 2,839 × 1,893; 867 KB
-
Salt Fire - 2021 07 07-18.36.32.499-CDT.jpg 1,280 × 720; 229 KB
-
Salt Fire - 2021 07 07-20.19.35.625-CDT.png 1,024 × 768; 2.05 MB
-
Salt Fire - 2021 07 07-20.21.19.775-CDT.jpg 1,280 × 1,072; 301 KB
-
Selaginella oregana 002.jpg 1,536 × 2,048; 2.4 MB
-
Seneca Valley High School, Germantown, Maryland (July 7, 2021).jpg 4,032 × 2,268; 2.86 MB
-
Sky Terrace Sushi Bar - July 2021 - Sarah Stierch.jpg 3,024 × 4,032; 8.78 MB
-
Somerville Community Path construction north of Sycamore Street, July 2021.jpg 4,032 × 3,024; 7.1 MB
-
Somerville Community Path ramp to Cross Street under construction, July 2021.jpg 4,032 × 3,024; 8.15 MB
-
South headhouse under construction at Lechmere station, July 2021.jpg 4,032 × 3,024; 3.37 MB
-
Stairs to southbound Red Line platform from Park Street station lobby, July 2021.jpg 4,032 × 3,024; 3.66 MB
-
Stub ramp on Red Bridge viaduct, July 2021.JPG 5,184 × 3,888; 3.05 MB
-
Suillus granulatus 141920952.jpg 1,536 × 2,048; 1,012 KB
-
Surface elevator to westbound Green Line platform at Park Street station, July 2021.jpg 4,032 × 3,024; 8.55 MB
-
Surface work on Temple Place exit, July 2021.jpg 4,032 × 3,024; 4.74 MB
-
Temporary bridge for North Washington Street Bridge replacement, July 2021.jpg 3,417 × 2,564; 4.07 MB
-
Tetraneura nigriabdominalis 141839809.jpg 2,048 × 1,154; 1.44 MB
-
Toll gantry entering City Square Tunnel, July 2021.jpg 4,032 × 3,024; 6.56 MB
-
Trichocerca cylindrica 144922736.gif 690 × 388; 2.91 MB
-
Trichocerca cylindrica 144923045.jpg 1,280 × 1,024; 788 KB
-
Union Square Branch from Squires Bridge, July 2021.jpg 4,032 × 3,024; 6.23 MB
-
Union Square station construction (1), July 2021.JPG 5,184 × 3,888; 4.49 MB
-
Union Square station construction (2), July 2021.JPG 5,184 × 3,888; 4.64 MB
-
Union Square station construction (3), July 2021.jpg 4,032 × 3,024; 6.75 MB
-
Union Square station construction (4), July 2021.JPG 5,184 × 3,888; 4.96 MB
-
Union Square station elevator construction, July 2021.JPG 5,184 × 3,888; 5.33 MB
-
Waltham Highlands station, July 2021.jpg 4,032 × 3,024; 4.23 MB
-
Xerospermophilus spilosoma 142000055.jpg 2,048 × 1,365; 1.49 MB