Category:Files from the Massachusetts Bay Transportation Authority
Jump to navigation
Jump to search
Media in category "Files from the Massachusetts Bay Transportation Authority"
The following 200 files are in this category, out of 201 total.
(previous page) (next page)-
1971 MBTA rapid transit map.jpg 2,707 × 2,832; 5.03 MB
-
1974 black background MBTA subway map.png 3,177 × 3,500; 22.87 MB
-
1974 MBTA commuter rail diagram.png 953 × 961; 1.18 MB
-
1974 MBTA system map reverse.png 3,500 × 3,041; 23.09 MB
-
1974 MBTA system map.png 3,031 × 3,500; 19.16 MB
-
1975 Lynn bus map.png 3,500 × 2,484; 15.46 MB
-
1975 MBTA commuter rail map.jpg 1,456 × 1,524; 779 KB
-
1975 MBTA system map.png 3,033 × 3,500; 17.39 MB
-
1978 map of the Red Line Northwest Extension.jpg 2,534 × 884; 353 KB
-
1978 MBTA commuter rail diagram.png 846 × 831; 1.34 MB
-
1978 MBTA map reverse.png 3,500 × 3,105; 27.06 MB
-
1978 MBTA subway map.png 855 × 822; 1.28 MB
-
1978 MBTA system map.png 3,500 × 3,949; 27.86 MB
-
1979 MBTA Commuter Rail map.png 976 × 979; 1.59 MB
-
1979 MBTA subway map.png 975 × 967; 1.45 MB
-
1980 MBTA system map reverse.png 3,500 × 3,102; 20.7 MB
-
1980 MBTA system map.png 3,104 × 3,500; 19.72 MB
-
1980 NH service.jpg 800 × 529; 175 KB
-
1982 MBTA downtown map.png 3,500 × 2,844; 27.99 MB
-
1982 MBTA system map.png 3,500 × 4,007; 28.79 MB
-
1988 MBTA Commuter Rail map.png 554 × 579; 485 KB
-
1988 MBTA subway map.png 552 × 524; 450 KB
-
1988 MBTA system map reverse.png 1,729 × 2,500; 7.48 MB
-
1988 MBTA system map.png 2,483 × 3,500; 16.95 MB
-
2023-3-3-cr-scr-freetown-ribbon-cutting-double-car-view-scaled.jpg 2,560 × 1,706; 1 MB
-
Access road preparation at Weaver's Cove Layover, August 2022.jpg 1,029 × 860; 295 KB
-
Aerial view of Assonet River bridge move, 2021.jpg 1,044 × 1,275; 635 KB
-
Aerial view of Fall River Depot construction, 2022.jpg 882 × 352; 180 KB
-
Aerial view of Harvard station construction, 1981.jpg 1,410 × 947; 150 KB
-
Alewife station isometric view showing art locations.jpg 4,032 × 2,564; 3.65 MB
-
Arrival information screen at Bray Street stop, November 2021.jpg 2,600 × 1,733; 821 KB
-
Assonet River bridge placement, 2021.jpg 572 × 303; 67 KB
-
Ballast delivery in Fall River, 2021.jpg 373 × 480; 63 KB
-
Barry Locke Harvard Brattle station ribbon cutting, March 1979.jpg 430 × 574; 125 KB
-
Boeing LRVs in an MBTA yard, 1986.jpg 1,976 × 2,969; 431 KB
-
Brand new MBTA BTC-4D.jpg 3,000 × 912; 658 KB
-
Bridge deck for platform track at Fall River Depot, 2022.jpg 1,201 × 1,068; 254 KB
-
Cambridge station temporary platform construction, 1978.jpg 1,066 × 824; 502 KB
-
Canopy construction at Fall River station, September 2022.jpg 376 × 275; 37 KB
-
Chain link fencing installation for South Coast Rail, 2022.jpg 568 × 737; 228 KB
-
Columbus Avenue bus lane ribbon cutting, November 2021 (Kim Janey).jpg 265 × 354; 148 KB
-
Columbus Avenue bus lane ribbon cutting, November 2021.jpg 2,600 × 1,349; 839 KB
-
Conduit installation at Church Street station, August 2022.jpg 1,832 × 1,374; 812 KB
-
Construction of Church Street station, February 2023.jpg 1,069 × 862; 252 KB
-
Construction of roadway to Middleborough station, 2022.jpg 1,803 × 1,285; 388 KB
-
Crew building at Weaver's Cove Layover under construction, July 2022.jpg 1,069 × 810; 224 KB
-
Davis station under construction, 1983.jpg 2,424 × 2,280; 1.85 MB
-
Dudley Street Terminal, circa 2002.jpg 2,457 × 1,430; 811 KB
-
Dumping South Coast Rail debris for an artificial reef, 2022.jpg 1,125 × 614; 155 KB
-
Dust control near Cotley Street, 2022.jpg 989 × 796; 287 KB
-
East Taunton station nearing completion, 2023.jpg 604 × 462; 148 KB
-
East Taunton station, 2023.jpg 734 × 594; 175 KB
-
Fall 1976 MBTA commuter rail diagram.png 962 × 957; 1.15 MB
-
Fall 1976 MBTA system map reverse.png 3,500 × 3,100; 23.54 MB
-
Fall 1976 MBTA system map.png 3,099 × 3,500; 22.36 MB
-
Fall 1977 MBTA system map reverse.png 3,500 × 3,099; 19.48 MB
-
Fall 1977 MBTA system map.png 3,500 × 3,973; 23.29 MB
-
Fall River station platform construction, September 2022.jpg 1,297 × 909; 275 KB
-
Fall River station under construction, September 2022.jpg 1,248 × 871; 284 KB
-
Forest Hills station construction, 1985.jpg 2,336 × 1,053; 2.78 MB
-
Freeman Street underpass looking northwest, Fields Corner MBTA station (25474427686).jpg 2,036 × 1,496; 285 KB
-
Gravel train at Fall River station, 2022.jpg 955 × 860; 350 KB
-
Harvard Brattle station construction, 1978.jpg 1,089 × 840; 396 KB
-
Harvard Brattle station ribbon cutting, March 1979.jpg 2,356 × 1,788; 1.92 MB
-
Harvard Brattle station, 1979.jpg 1,734 × 856; 528 KB
-
Harvard station construction in Flagstaff Park, 1979.jpg 2,376 × 1,880; 392 KB
-
Haymarket North Extension flier April 4 1975.jpg 1,091 × 1,701; 1.5 MB
-
Inbound train at Brookline Hills station, January 2022.jpg 1,300 × 835; 400 KB
-
Inbound train at MBTA Airport Station, 1985.jpg 1,006 × 852; 460 KB
-
Inbound train at Packards Corner, circa 1972.jpg 2,052 × 870; 1.49 MB
-
Inbound train at Readville upper level, 1979.jpg 2,331 × 1,509; 1.72 MB
-
Interior construction of Harvard station, 1981.jpg 1,398 × 1,009; 122 KB
-
Jamey Tesler speaking at Medford Branch opening, December 2022.jpg 2,600 × 1,730; 662 KB
-
Johnston Gate entrance to Harvard station, 1984.jpg 1,136 × 2,253; 334 KB
-
Light pole installation at Freetown station, August 2022.jpg 1,389 × 1,042; 343 KB
-
March 1980 MBTA route 39 advertising pamphlet.pdf 706 × 1,650, 3 pages; 1.81 MB
-
May 1981 Eastern Line and Gloucester Branch schedule.pdf 1,302 × 439, 2 pages; 6.8 MB
-
MBTA 1105 at Bradford, circa 1979.jpg 426 × 322; 77 KB
-
MBTA 1105 at North Station, 1984.jpg 1,174 × 1,216; 668 KB
-
MBTA 1700 series Red Line car under construction, 1986.jpg 1,976 × 2,977; 401 KB
-
MBTA 1831 at Freetown station, December 2022.jpg 1,141 × 773; 318 KB
-
MBTA 520 with South Coast Rail wrap.jpg 1,500 × 900; 352 KB
-
MBTA Blue Line Pill.png 632 × 128; 8 KB
-
MBTA Board member Claire R. Barrett May 1978.jpg 195 × 249; 19 KB
-
MBTA BTC-4D interior.jpg 2,048 × 1,365; 842 KB
-
MBTA Bus Pill.png 330 × 128; 8 KB
-
MBTA Commuter Rail Pill.png 816 × 128; 16 KB
-
MBTA CTC-5 1828.jpg 2,048 × 1,365; 776 KB
-
MBTA demonstration train at Concord, N.H., May 1979.jpg 599 × 441; 149 KB
-
MBTA Ferry Pill.png 447 × 128; 7 KB
-
MBTA Green Line Pill.png 712 × 128; 10 KB
-
MBTA Orange Line Pill.png 790 × 128; 13 KB
-
MBTA pass program sales office, circa 1978.jpg 1,614 × 1,299; 1.09 MB
-
MBTA Red Line Pill.png 576 × 128; 8 KB
-
MBTA route 245 bus, circa 1972.jpg 2,152 × 964; 1.55 MB
-
MBTA route 29 bus at Walnut Avenue stop, September 2021.jpg 2,600 × 1,733; 1.09 MB
-
MBTA route 49 bus, circa 2002.jpg 1,086 × 777; 252 KB
-
MBTA Silver Line Advertising Flyer.tif 3,529 × 1,501; 16.82 MB
-
MBTA Silver Line Bus Historical Advertising.tif 1,298 × 742; 3.16 MB
-
MBTA Silver Line Historical Route Map.tif 2,344 × 2,743; 16.49 MB
-
MBTA Silver Line logo.png 580 × 91; 36 KB
-
MBTA Silver Line Pill.png 704 × 128; 12 KB
-
MBTA.svg 512 × 512; 593 bytes
-
Model of Harvard Square subway headhouses, 1978.jpg 2,598 × 1,753; 501 KB
-
New Bedford station under construction, 2023.jpg 513 × 411; 78 KB
-
New elevator at Park Street station, 1979.jpg 2,200 × 1,661; 516 KB
-
North busway looking northwest, Fields Corner MBTA Station (25382069282).jpg 2,020 × 1,452; 275 KB
-
North Station under construction, circa 1972.jpg 2,148 × 1,160; 1.97 MB
-
Northern sector transit alternatives map from 1966 PMT.jpg 1,661 × 2,219; 245 KB
-
NRHP ceremony for Harvard Square Subway Kiosk, April 1978.jpg 2,093 × 1,224; 263 KB
-
Overhead view of Columbus Avenue bus lanes, November 2021.jpg 2,600 × 1,733; 1.23 MB
-
Parking lot paving at Freetown station, August 2022.jpg 1,051 × 788; 258 KB
-
Part of Celebration of the Underground, 1978.jpg 1,044 × 831; 127 KB
-
Photo op train at Freetown station, December 2022.jpg 2,600 × 1,733; 772 KB
-
Plan of Cross Street station, 1977.jpg 3,070 × 1,970; 383 KB
-
Platform installation at East Taunton station, February 2023.jpg 405 × 383; 84 KB
-
Porter Square station opening ceremony, December 1984.jpg 617 × 486; 198 KB
-
Quincy Center station aerial, circa 1972.jpg 2,157 × 885; 1.98 MB
-
Rebar cages for Church Street station (1), January 2022.jpg 1,724 × 1,290; 660 KB
-
Rebar cages for Church Street station (2), January 2022.jpg 1,698 × 1,264; 702 KB
-
Rebar cages for Church Street station, December 2021.jpg 516 × 351; 73 KB
-
Ribbon cutting at Medford Branch opening, December 2022.jpg 2,600 × 1,465; 662 KB
-
Ribbon cutting ceremony at Freetown station, December 2022.jpg 2,600 × 1,593; 872 KB
-
ROW work in New Bedford (1), January 2022.jpg 640 × 480; 108 KB
-
ROW work in New Bedford (2), January 2022.jpg 1,730 × 1,288; 723 KB
-
ROW work in New Bedford (3), January 2022.jpg 1,726 × 1,290; 814 KB
-
Setting ties for South Coast Rail, 2022.jpg 1,228 × 908; 522 KB
-
Sign at Cross Street station, 1977.jpg 517 × 614; 80 KB
-
Site cleared for Middleborough station.jpg 481 × 640; 125 KB
-
Site clearing for East Taunton station (1).jpg 572 × 762; 271 KB
-
Site clearing for East Taunton station (2).jpg 729 × 972; 329 KB
-
Site clearing for East Taunton station (3).jpg 1,087 × 816; 345 KB
-
Site clearing work for Middleborough station, 2020.jpg 1,067 × 1,293; 350 KB
-
Site preparation at Freetown station, 2021.jpg 1,080 × 709; 328 KB
-
South busway, Fields Corner MBTA station (25204937370).jpg 2,044 × 1,400; 237 KB
-
South Coast Rail work crew at Fall River Depot.jpg 1,731 × 1,391; 567 KB
-
South Cove Tunnel construction, March 1971.jpg 1,176 × 1,416; 391 KB
-
Special work near Cotley Junction, 2022.jpg 1,135 × 1,514; 572 KB
-
Spring 1976 MBTA system map.png 3,043 × 3,500; 19.02 MB
-
Spring–Summer 1977 MBTA system map.png 3,105 × 3,500; 18.71 MB
-
Station head house and platform, Savin Hill MBTA station (25210206290).jpg 3,563 × 2,419; 725 KB
-
Station head house, facade, west portion of rear (south) elevation (25138292319).jpg 3,551 × 2,430; 1.15 MB
-
Station sign at Fall River station, 2022.jpg 476 × 348; 57 KB
-
Steve Poftak speaking at Medford Branch opening, December 2022.jpg 2,600 × 1,730; 691 KB
-
Streetcar mural at Auditorium station, 1977.jpg 2,285 × 1,575; 547 KB
-
Suffolk Downs station construction, 1983.jpg 1,230 × 701; 97 KB
-
Summer 1976 MBTA Commuter Rail map.png 968 × 959; 1.21 MB
-
Summer 1976 MBTA system map reverse.png 3,500 × 3,085; 18.86 MB
-
Summer 1976 MBTA system map.png 3,069 × 3,500; 18.62 MB
-
Ted Landsmark Harvard Brattle station ribbon cutting, March 1979.jpg 571 × 761; 224 KB
-
The T Arrives In Medford.pdf 1,687 × 2,612, 10 pages; 9.77 MB
-
Track installation at Cotley Junction, 2022.jpg 937 × 1,081; 335 KB
-
Tufts University station with RDC, September 1977.png 2,259 × 1,587; 2.47 MB
-
Type 9 on first day of revenue service, December 2018.jpg 1,125 × 750; 192 KB
-
Unknown underpass, Fields Corner MBTA station (25407720251).jpg 1,404 × 2,056; 326 KB
-
Vendor outside Haymarket station, 1984.jpg 1,138 × 1,726; 261 KB
-
Washington Station Concourse plan, 1977.jpg 2,052 × 1,400; 543 KB
-
Washington Station Concourse, 1978.jpg 834 × 828; 324 KB
-
Weaver's Cove Layover under construction, September 2022.jpg 1,047 × 673; 115 KB
-
Worker at East Taunton station, February 2023.jpg 732 × 651; 174 KB