Category:East Side Access construction/2019/09/13
Jump to navigation
Jump to search
Media in category "East Side Access construction/2019/09/13"
The following 24 files are in this category, out of 24 total.
-
Cable reels used to pull cables. 09-12-2019 (48727688148).jpg 3,024 × 4,032; 2.2 MB
-
Escalator installation in the future LIRR Terminal. 09-06-2019 (48727688358).jpg 4,032 × 3,024; 4.17 MB
-
Excavation along the tracks in Harold Interlocking. 09-13-2019 (48728189342).jpg 1,512 × 2,016; 1.33 MB
-
Installing conduit along the tunnels in Queens. 09-09-2019 (48728189487).jpg 3,024 × 4,032; 3.21 MB
-
Installing elevator paneling in the future LIRR Terminal. 09-06-2019 (48728189657).jpg 4,032 × 3,024; 3.37 MB
-
Installing gallery supports along the future LIRR Concourse. 09-10-2019 (48728189602).jpg 3,264 × 2,448; 1.49 MB
-
Tile finishes going up in the future LIRR Terminal. 09-05-2019 (48728189642).jpg 4,032 × 3,024; 2.96 MB