File:BART system map effective May 2018.png
Original file (8,400 × 7,000 pixels, file size: 915 KB, MIME type: image/png)
Captions
Summary[edit]
DescriptionBART system map effective May 2018.png |
English: BART system map accurate to the May 26, 2018 opening of the eBART line |
||||
Date | |||||
Source | BART to Antioch: East Contra Costa BART Extension | ||||
Author | San Francisco Bay Area Rapid Transit District | ||||
Permission (Reusing this file) |
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 00:04, 23 May 2018 | 8,400 × 7,000 (915 KB) | Pi.1415926535 (talk | contribs) | {{Information |description ={{en|1=BART system map accurate to the May 26, 2018 opening of the eBART line}} |source =[https://web.archive.org/web/20180523000248/https://www.bart.gov/about/projects/ecc BART to Antioch: East Contra Costa BART Extension] |author =San Francisco Bay Area Rapid Transit District |date =2018-05-26 |permission ={{PD-CAGov}} }} 20180526 Category:BART in 2018 Category:2018 maps [[Category:May 2018 in C... |
You cannot overwrite this file.
File usage on Commons
The following 4 pages use this file:
File usage on other wikis
The following other wikis use this file:
- Usage on oc.wikipedia.org
- Usage on zh.wikipedia.org
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Horizontal resolution | 78.75 dpc |
---|---|
Vertical resolution | 78.75 dpc |