File:A2 CM cleanroom integration.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(6,245 × 4,430 pixels, file size: 16.9 MB, MIME type: image/jpeg)

Captions

Captions

Artemis 2 CM in work at KSC

Summary[edit]

Description
English: The crew module for NASA’s Artemis II mission is shown inside Kennedy Space Center’s Neil A. Armstrong Operations and Checkout Building on July 15, 2021. Artemis will lay the foundation for a sustained long-term presence on the lunar surface. NASA will use the Moon to validate deep space systems and operations before embarking on a human voyage to Mars.
Date
Source

https://www.nasa.gov/feature/next-generation-of-orion-spacecraft-in-production-for-future-artemis-missions

https://www.flickr.com/photos/nasakennedy/51368185845/
Author NASA/Kim Shiflett
Kim Shiflett    wikidata:Q117448892
 
Description photographer
Authority file
creator QS:P170,Q117448892

Licensing[edit]

Public domain This file is in the public domain in the United States because it was solely created by NASA. NASA copyright policy states that "NASA material is not protected by copyright unless noted". (See Template:PD-USGov, NASA copyright policy page or JPL Image Use Policy.)
Warnings:

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:40, 15 September 2021Thumbnail for version as of 09:40, 15 September 20216,245 × 4,430 (16.9 MB)Broken Soap (talk | contribs)Uploaded a work by NASA PAO from https://www.nasa.gov/feature/next-generation-of-orion-spacecraft-in-production-for-future-artemis-missions https://www.flickr.com/photos/nasakennedy/51368185845/ with UploadWizard

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata