File:United States Navy Seabees connect a winch to a section of mooring chain.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 600 pixels. Other resolutions: 320 × 240 pixels | 640 × 480 pixels | 1,024 × 768 pixels | 1,280 × 960 pixels | 2,560 × 1,920 pixels | 4,032 × 3,024 pixels.
Original file (4,032 × 3,024 pixels, file size: 3.99 MB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary[edit]
DescriptionUnited States Navy Seabees connect a winch to a section of mooring chain.jpg | 171127-N-PF688-001 APRA HARBOR, Guam (Nov. 27, 2017) U.S. Navy Seabees assigned Underwater Construction Team 2 Construction Diving Detachment ALFA (CDDA), and Naval Mobile Construction Battalion 133 Detail Guam connect a winch to a section of mooring chain in Apra Harbor, Guam. CDDA is conducting the systematic removal of 10,000 feet of mooring chain left behind by the former dry dock Ex-Machinist, known locally as “Big Blue”, utilizing various underwater construction techniques. CDDA is on the 4th stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben McCallum/Released) | |||||||
Date | ||||||||
Source | https://allhands.navy.mil/Media/Gallery/igphoto/2002410063/ | |||||||
Author | U.S. Navy photo by Construction Mechanic 2nd Class Ben McCallum | |||||||
Permission (Reusing this file) |
|
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 08:32, 11 March 2021 | 4,032 × 3,024 (3.99 MB) | Gildir (talk | contribs) | {{Information |Description=171127-N-PF688-001 APRA HARBOR, Guam (Nov. 27, 2017) U.S. Navy {{w|Seabee}}s assigned Underwater Construction Team 2 Construction Diving Detachment ALFA (CDDA), and Naval Mobile Construction Battalion 133 Detail Guam connect a winch to a section of mooring chain in Apra Harbor, Guam. CDDA is conducting the systematic removal of 10,000 feet of mooring chain left behind by the former dry dock Ex-Machinist, known locally as “Big Blue”, utilizing various underwater cons... |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Camera manufacturer | Apple |
---|---|
Camera model | iPhone 7 |
Exposure time | 1/3,195 sec (0.00031298904538341) |
F-number | f/1.8 |
ISO speed rating | 20 |
Lens focal length | 3.99 mm |
Date and time of data generation | 04:31, 20 November 2017 |
City shown | Apra Harbor |
Short title | 171127-N-PF688-001 |
Author | U.S. Navy Photographer, Petty Officer 2nd Class Ben McCallum |
Credit/Provider | U.S. Navy |
Source | Navy Media Content Operations |
Image title | 171127-N-PF688-001 APRA HARBOR, Guam (Nov. 27, 2017) U.S. Navy Seabees assigned Underwater Construction Team 2 Construction Diving Detachment ALFA (CDDA), and Naval Mobile Construction Battalion 133 Detail Guam connect a winch to a section of mooring chain in Apra Harbor, Guam. CDDA is conducting the systematic removal of 10,000 feet of mooring chain left behind by the former dry dock Ex-Machinist, known locally as “Big Blue”, utilizing various underwater construction techniques. CDDA is on the 4th stop of their six-month deployment, where they are conducting inspection, maintenance, and repair of various underwater and waterfront facilities in support of the Pacific Fleet. (U.S. Navy photo by Construction Mechanic 2nd Class Ben McCallum/Released) |
Headline | UCT 2 and NMCB 133 Work Together to Remove Old Mooring Chains |
Copyright holder | Public Domain |
Orientation | Normal |
Horizontal resolution | 72 dpi |
Vertical resolution | 72 dpi |
Exposure Program | Normal program |
Exif version | 2.21 |
Meaning of each component |
|
APEX shutter speed | 11.641550053821 |
APEX aperture | 1.6959937156324 |
APEX brightness | 10.885411872987 |
APEX exposure bias | 0 |
Metering mode | Pattern |
Flash | Flash did not fire, compulsory flash suppression |
Supported Flashpix version | 1 |
Sensing method | One-chip color area sensor |
Scene type | A directly photographed image |
Exposure mode | Auto exposure |
White balance | Auto white balance |
Focal length in 35 mm film | 28 mm |
Scene capture type | Standard |
IIM version | 3 |
Country shown | Guam |
Category | N |
Supplemental categories |
|
Keywords |
|
Writer | MC2 Paul L. Archer |
Special instructions | Released/distributed by navy media Content Operations 703-614-9154 |
Original transmission location code | Underwater Construction Team 2 Construction Diving Detachment |
Supported Flashpix version | 0.01 |
Image width | 4,032 px |
Image height | 3,024 px |
Date metadata was last modified | 00:22, 5 December 2017 |
File change date and time | 5 December 2017 |
Date and time of digitizing | 04:31, 20 November 2017 |
Rating (out of 5) | 0 |
Copyright status | Copyrighted |
Identifier | DVIDS Image ID 3996418 |
Code for country shown | GU |
Structured data
Items portrayed in this file
depicts
Categories:
- Apra Harbor
- Men wearing black shorts
- Men with arm tattoos
- Military people of the United States in 2017
- Naval Mobile Construction Battalion 133
- November 2017 in Guam
- People at work in Guam
- People at work in the 2010s
- Women wearing hard hats
- Topless male construction workers
- Topless male sailors
- Topless male underwater divers
- Topless men in Guam
- Topless men with tattoos
- Women with arm tattoos
- 1 and 2 people
- Underwater Construction Team 2
Hidden categories: