File:Turbine Blade Delivery to Scout Moor - geograph.org.uk - 1005903.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Turbine_Blade_Delivery_to_Scout_Moor_-_geograph.org.uk_-_1005903.jpg(640 × 480 pixels, file size: 53 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Turbine Blade Delivery to Scout Moor. Another two of the blades out of a final total of 78 are seen here

being delivered to the construction site of the Scout Moor Wind Farm. Each blade weighs in at 8 tons and are 40 metres in length. The partially constructed tower in the picture is Turbine No 16 which was finally completed in March 2008 after delays due to gale force winds.

855939 685291 670438 622953 631116 824546

Turbine details: Tower Height: 60m Blade Length: 40m Total Max Height: 100m Manufacturer: Nordex Model: N80

collett heavy transport
Date
Source From geograph.org.uk
Author Paul Anderson
Attribution
(required by the license)
InfoField
Paul Anderson / Turbine Blade Delivery to Scout Moor / 
Paul Anderson / Turbine Blade Delivery to Scout Moor
Camera location53° 39′ 42″ N, 2° 14′ 49″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 39′ 44″ N, 2° 14′ 53″ W  Heading=315° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Paul Anderson
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:55, 23 February 2011Thumbnail for version as of 08:55, 23 February 2011640 × 480 (53 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Turbine Blade Delivery to Scout Moor Another two of the blades out of a final total of 78 are seen here being delivered to the construction site of the Scout Moor Wind Farm. Each blade weighs in

There are no pages that use this file.

Metadata