File:Sukarno and Setiadi Reksoprodjo opening a new steam-electric power station.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(599 × 739 pixels, file size: 239 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: President Sukarno (left) with Minister of Electricity and Power Setiadi Reksoprodjo (middle) and the Vice President of the Japanese Liberal Democratic Party Shojiro Kawashima (right) opening the PLTU Unit 3 and 4 in Jakarta at the end of August 1965. The official opening was done by turning on a switch that immediately spins a concrete spinner.
Date
Source Mingguan Djaja, Issue 189, p. 3, photo in here
Author Unnamed photographer from the Djaja Magazine
Permission
(Reusing this file)

According to the copyright law in effect in Indonesia at the time of the URAA, copyright on this image expired on 1 January 1980 (25 years after publication). As the new copyright law was enacted in 2002, after the URAA, copyright was not extended in the United States.

Public domain
This file is in the public domain in Indonesia because its copyright has expired, according to Articles 30 and 31 of the Indonesia Copyright Law No 19, 2002.

Article 30

  1. The Copyright on:
    1. computer programs,
    2. cinematographic works,
    3. photographic works,
    4. databases, and
    5. works resulting from adaptations
    shall be valid for 50 (fifty) years as of the first publication.
  2. The Copyright on topographical arrangement of a published work shall be valid for 50 (fifty) years after as of the first publication of the Work.
  3. The Copyright of works as referred to in paragraphs (1) and (2) of this article, and Article 29 paragraph (1) which are owned or held by a legal body, shall be valid for 50 (fifty) years as of from the first publication.

Article 31

  1. The Copyright on works which are held or exercised by the State, pursuant to:
    1. Article 10 paragraph (2), shall be valid without any time limit;
    2. Article 11 paragraph (1) and paragraph (3) shall be valid for 50 (fifty) years as of the first time the work is known to the public.
  2. The Copyright on works which are exercised by publishers pursuant to Article 11 paragraph (2) shall be valid for 50 (fifty) years as of the first publication.

العربيَّة | English | Bahasa Indonesia | македонски | português | русский | slovenščina | +/−

Public domain

For background information, see the explanations on Non-U.S. copyrights.
Note: This tag should not be used for sound recordings.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current09:47, 5 January 2021Thumbnail for version as of 09:47, 5 January 2021599 × 739 (239 KB)Jeromi Mikhael (talk | contribs){{Information |Description={{en|President Sukarno (left) with Minister of Electricity and Power Setiadi Reksoprodjo (middle) opening the PLTU Unit 3 and 4 in Jakarta at the end of August 1965. The official opening was done by turning on a switch that immediately spins a concrete spinner. On the back is a Japanese named Shojiro Kawashima.}} |Source= [https://books.google.co.id/books?id=VM7nAAAAMAAJ Mingguan Djaja, Issue 189, p. 3], photo in [https://www.facebook.com/photo?fbid=1790072447877810...

There are no pages that use this file.

File usage on other wikis

The following other wikis use this file:

Metadata