File:Operational procedures 120827-F-EA289-004.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,155 × 2,496 pixels, file size: 2.57 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Paul Ross, 509th Civil Engineer Squadron central heat plant project manager, and John Goff, 509th CES boiler operator, discuss a centrifugal pump's operational procedures, Aug. 27. The 50-horsepower pump is used to distribute water for use in the heat plant's boilers. (U.S. Air Force photo/Senior Airman Nick Wilson)
Date Taken on 27 August 2012
Source https://www.dvidshub.net/image/807960
Author Staff Sgt. Nicholas Wilson
Location
InfoField
WHITEMAN AIR FORCE BASE, MO, US
VIRIN
InfoField

This image was released by the United States Air Force with the ID 120827-F-EA289-004 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Search DVIDs
Posted
InfoField
31 December 2012, 16:10
Archive link
InfoField
archive copy at the Wayback Machine

Licensing[edit]

Public domain
This image or file is a work of a U.S. Air Force Airman or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image or file is in the public domain in the United States.

العربية  беларуская (тарашкевіца)  català  čeština  Deutsch  English  español  eesti  فارسی  suomi  français  italiano  日本語  한국어  македонски  മലയാളം  မြန်မာဘာသာ  norsk bokmål  Plattdüütsch  Nederlands  polski  português  português do Brasil  русский  sicilianu  slovenčina  slovenščina  српски / srpski  svenska  Türkçe  українська  Tiếng Việt  中文(简体)  中文(繁體)  +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:47, 30 April 2015Thumbnail for version as of 04:47, 30 April 20154,155 × 2,496 (2.57 MB) (talk | contribs)== {{int:filedesc}} == {{milim | description = {{en|1=Paul Ross, 509th Civil Engineer Squadron central heat plant project manager, and John Goff, 509th CES boiler operator, discuss a centrifugal pump's operational procedures, Aug. 27. The 50-horsepower...

Metadata