File:Folsom’s ‘second dam’ beginning to take shape (8683696335).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(4,288 × 2,848 pixels, file size: 947 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Construction crews work inside one of the bays of the Folsom Dam auxiliary spillway control structure April 24, 2013 in Folsom, Calif. The structure, essentially a second dam, will include a total of six bays that are each 34 ft. high and 23 ft. wide. The control structure, essentially a second dam, will work with the main dam to release water from the reservoir during large storms. (U.S. Army photo by Capt. Michael N. Meyer/Released)
Date
Source Folsom’s ‘second dam’ beginning to take shape
Author U.S. Army Corps of Engineers Sacramento District

Licensing[edit]

Public domain
This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

English | italiano | Nederlands | پښتو | русский | sicilianu | slovenščina | Türkçe | українська | +/−


This image was originally posted to Flickr by USACE-Sacramento District at https://flickr.com/photos/52057813@N07/8683696335. It was reviewed on 12 October 2016 by FlickreviewR and was confirmed to be licensed under the terms of the United States Government Work.

12 October 2016

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current05:12, 12 October 2016Thumbnail for version as of 05:12, 12 October 20164,288 × 2,848 (947 KB)Vanished Account Byeznhpyxeuztibuo (talk | contribs)Transferred from Flickr via Flickr2Commons

There are no pages that use this file.

Metadata