File:Crews work to clear wreckage from the Francis Scott Key Bridge (240405-A-SL031-4104).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(5,295 × 3,492 pixels, file size: 10.12 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Debris removed from the Patapsco River is loaded onto a barge for removal by response personnel. The Unified Command is working to restore flow of critical commerce in and out of Baltimore. Key Bridge Response 2024 Unified Command photo by Dylan Burnell, USACE.
Date
Source https://www.dvidshub.net/image/8324936/crews-work-clear-wreckage-francis-scott-key-bridge
Author Dylan Burnell / U.S. Army Corps of Engineers
Location
InfoField
Baltimore, Maryland
VIRIN
InfoField

This image was released by the United States Army with the ID 240405-A-SL031-4104 (next).
This tag does not indicate the copyright status of the attached work. A normal copyright tag is still required. See Commons:Licensing.


العربية  বাংলা  Deutsch  Deutsch (Sie-Form)  English  español  euskara  فارسی  français  italiano  日本語  한국어  македонски  മലയാളം  Plattdüütsch  Nederlands  polski  پښتو  português  русский  slovenščina  svenska  Türkçe  українська  简体中文  繁體中文  +/−

Search DVIDs
Posted
InfoField
6 April 2024

Licensing[edit]

Public domain
This image or file is a work of a U.S. Army Corps of Engineers soldier or employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

English | italiano | Nederlands | پښتو | русский | sicilianu | slovenščina | Türkçe | українська | +/−

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current19:37, 7 April 2024Thumbnail for version as of 19:37, 7 April 20245,295 × 3,492 (10.12 MB)AntiCompositeNumber (talk | contribs){{milim |description ={{en| Debris removed from the Patapsco River is loaded onto a barge for removal by response personnel. The Unified Command is working to restore flow of critical commerce in and out of Baltimore. Key Bridge Response 2024 Unified Command photo by Dylan Burnell, USACE. }} |date =2024-04-06 |source =https://www.dvidshub.net/image/8324936/crews-work-clear-wreckage-francis-scott-key-bridge |author =Dylan Burnell / U.S. Army Corps of Engineers...

There are no pages that use this file.

Metadata