File:Chemin de Fer de l'Est - Travaux vers Domgermain. Remblai route nationale & Tranchée du Prêtre noyé. Ligne contournement de Toul.jpg
From Wikimedia Commons, the free media repository
Jump to navigation
Jump to search
Size of this preview: 800 × 557 pixels. Other resolutions: 320 × 223 pixels | 640 × 446 pixels | 1,024 × 713 pixels | 1,280 × 891 pixels | 1,540 × 1,072 pixels.
Original file (1,540 × 1,072 pixels, file size: 508 KB, MIME type: image/jpeg)
File information
Structured data
Captions
Summary[edit]
DescriptionChemin de Fer de l'Est - Travaux vers Domgermain. Remblai route nationale & Tranchée du Prêtre noyé. Ligne contournement de Toul.jpg |
Deutsch: Chemin de Fer de l'Est: 1. Los, genannt Baustelle 'DOMGERMAIN'. Strecke zur Umgehung von Toul
Français : Chemin de Fer de l'Est - Travaux vers Domgermain. Remblai route nationale & Tranchée du Prêtre noyé. Ligne contournement de Toul, daté du 9 Mars 1933 |
||
Date | |||
Source | https://www.ebay.fr/itm/374578215763 | ||
Author | Unknown photographer | ||
Other versions |
|
This is a retouched picture, which means that it has been digitally altered from its original version. Modifications: Retouched using GIMP 2.10 to remove a superimposed flower. Modifications made by NearEMPTiness.
|
Licensing[edit]
Public domainPublic domainfalsefalse |
This work is in the public domain in France for one of the following reasons:
Please note that moral rights still apply when the work is in the public domain. They encompass, among others, the right to the respect of the author's name, quality and work (CPI art. L121-1). Attribution therefore remains mandatory.
العربية ∙ English ∙ español ∙ français ∙ 日本語 ∙ 한국어 ∙ македонски ∙ русский ∙ Tiếng Việt ∙ 简体中文 ∙ 繁體中文 ∙ +/− |
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 20:03, 6 April 2023 | 1,540 × 1,072 (508 KB) | NearEMPTiness (talk | contribs) | Retouched using GIMP 2.10 to remove superimposed flower at the bottom edge | |
20:02, 6 April 2023 | 1,600 × 1,167 (340 KB) | NearEMPTiness (talk | contribs) | {{Information |description={{de|1=Chemin de Fer de l'Est: 1. Los, genannt Baustelle 'DOMGERMAIN'. Strecke zur Umgehung von Toul}} {{fr|1=Chemin de Fer de l'Est - Travaux vers Domgermain. Remblai route nationale & Tranchée du Prêtre noyé. Ligne contournement de Toul, daté du 9 Mars 1933}} |date=1933-03-09 |source=https://www.ebay.fr/itm/374578215763 |author={{unknown photographer}} |permission= |other versions= }} =={{int:license-header}}== {{PD-France}} Category:Toul [[Category:Domgerma... |
You cannot overwrite this file.
File usage on Commons
There are no pages that use this file.
Metadata
This file contains additional information such as Exif metadata which may have been added by the digital camera, scanner, or software program used to create or digitize it. If the file has been modified from its original state, some details such as the timestamp may not fully reflect those of the original file. The timestamp is only as accurate as the clock in the camera, and it may be completely wrong.
Image title | Processed By eBay with ImageMagick, z1.1.0. ||B2 |
---|---|
User comments | Processed By eBay with ImageMagick, z1.1.0. ||B2 |
JPEG file comment | Retouched to remove superimposed flower at the bottom edge using GIMP 2.10 |
Orientation | Normal |
Horizontal resolution | 300 dpi |
Vertical resolution | 300 dpi |
Software used | GIMP 2.10.32 |
File change date and time | 21:59, 6 April 2023 |
Color space | sRGB |
Unique ID of original document | xmp.did:3213d968-a35b-4956-9666-51850689657d |