File:Chaine conditionnement bacpro mei 2009.svg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(SVG file, nominally 662 × 616 pixels, file size: 492 KB)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Production of bier bottles: chronology of the process from the unpackaging of empty bottles to the packaging of boards on pallets:
  • unpackaging of bottles;
  • inspection and washing of bottles;
  • filling;
  • putting the stopper;
  • placing the wire hood;
  • sticking the labels;
  • placing in cardboards;
  • stacking on a pallet.
The references to the name of the bier was removed
Français : Production de bouteilles de bière : chronologie des opérations depuis le déconditionnement des bouteilles vides jusqu'au stockage sur palettes. Les références au nom de la bière ont été supprimées.
Date 2009, 2011-01-25
Source Own work
Author Cdang


 
This W3C-unspecified vector image was created with Inkscape .

Licensing[edit]

Public domain
This file is in the public domain because
English
Copied from examination questions of a national French diploma, considered as public domain by jurisprudence (Tribunal de grande instance de Paris, 9 november 1988, and Cour d’appel de Paris, 13 june 1991).
French
Copié d'un sujet d'examen national français, considéré dans le domaine public par la jurisprudence (Tribunal de grande instance de Paris, 9 novembre 1988, et Cour d’appel de Paris, 13 juin 1991).

This template must not be used to dedicate an uploader's own work to the public domain; CC0 should be used instead.

This work must carry justifications for free usability in both the United States and its country of origin.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:23, 25 January 2011Thumbnail for version as of 08:23, 25 January 2011662 × 616 (492 KB)Cdang (talk | contribs){{Information |Description ={{en|1=Production of bier bottles: chronology of the process from the unpackaging of empty bottles to the packaging of boards on pallets: * unpackaging of bottles; * inspection and washing of bottles; * filling; * putting th

The following 2 pages use this file:

File usage on other wikis