File:Camp Wellfleet Final EECA Figure 1-5 a.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Camp_Wellfleet_Final_EECA_Figure_1-5_a.jpg(660 × 480 pixels, file size: 201 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Figure 1-5: Brush Clearance. Top: Brush clearing in Area B.

The text of the report states:

1.4.2.2.4.1 After survey grid reference points were established within each survey grid, clearance of obstructive vegetative brush cover was performed (Figure 1-5) as necessary, to permit the acquisition of high-resolution, line-based geophysical data within the grid. Hand operated gas powered (as opposed to heavy machinery) clearance equipment was used during this procedure to minimize potential environmental impacts in the area.
Date
Source Final Former Camp Wellfleet Engineering Evaluation/Cost Analysis. Prepared by Foster Wheeler Environmental Corporation, May 2000, for U.S Army Engineering and Support Center, Huntsville, Alabama.
Author Foster Wheeler Environmental Corporation for U. S. government

Licensing[edit]

Public domain
This work is in the public domain in the United States because it is a work prepared by an officer or employee of the United States Government as part of that person’s official duties under the terms of Title 17, Chapter 1, Section 105 of the US Code. Note: This only applies to original works of the Federal Government and not to the work of any individual U.S. state, territory, commonwealth, county, municipality, or any other subdivision. This template also does not apply to postage stamp designs published by the United States Postal Service since 1978. (See § 313.6(C)(1) of Compendium of U.S. Copyright Office Practices). It also does not apply to certain US coins; see The US Mint Terms of Use.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:09, 9 January 2023Thumbnail for version as of 15:09, 9 January 2023660 × 480 (201 KB)Jstuby (talk | contribs)Uploaded a work by Foster Wheeler Environmental Corporation for U. S. government from Final Former Camp Wellfleet Engineering Evaluation/Cost Analysis. Prepared by Foster Wheeler Environmental Corporation, May 2000, for U.S Army Engineering and Support Center, Huntsville, Alabama. with UploadWizard

There are no pages that use this file.