File:Beam Installation-5 GA (8450752429).jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(2,816 × 2,112 pixels, file size: 2.82 MB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description After the intermediate bents were assembled, the 130-foot long prestressed “bulb-I” bridge beams were installed as part of an FHWA, Highways for LIFE supported new construction project with GDOT. Beam delivery required the contractor to briefly close both lanes in either the NB or SB direction of I-85. Up to three beams were removed from the transport trucks and set into place using two cranes while the lane closure was in place.
Date
Source Beam Installation-5_GA
Author Federal Highway Administration

Licensing[edit]

This image was originally posted to Flickr by Federal Highway Administration (FHWA) at https://flickr.com/photos/64293484@N05/8450752429 (archive). It was reviewed on 17 August 2018 by FlickreviewR 2 and was confirmed to be licensed under the terms of the cc-by-2.0.

17 August 2018

Public domain This image is a work of a United States Department of Transportation employee, taken or made as part of that person's official duties. As a work of the U.S. federal government, the image is in the public domain.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current15:42, 17 August 2018Thumbnail for version as of 15:42, 17 August 20182,816 × 2,112 (2.82 MB)Tyler ser Noche (talk | contribs)Transferred from Flickr via #flickr2commons

There are no pages that use this file.

Metadata