File:Access road to the breakwater along the line of the old construction tramway - geograph.org.uk - 876737.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: Access road to the breakwater along the line of the old construction tramway The tramway was used during the construction of the breakwater (seen in the middleground, right )for transporting fill from a quarry on the nearby Holyhead Mountain. The facing blocks for the breakwater came from quarries in the Moelfre area on the east coast of Anglesey. 755014
Date
Source From geograph.org.uk
Author Eric Jones
Attribution
(required by the license)
InfoField
Eric Jones / Access road to the breakwater along the line of the old construction tramway / 
Eric Jones / Access road to the breakwater along the line of the old construction tramway
Camera location53° 19′ 12″ N, 4° 39′ 03″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location53° 19′ 14″ N, 4° 39′ 00″ W  Heading=45° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Eric Jones
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:11, 21 February 2011Thumbnail for version as of 08:11, 21 February 2011640 × 420 (38 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=Access road to the breakwater along the line of the old construction tramway The tramway was used during the construction of the breakwater (seen in the middleground, right )for transporting fill f

There are no pages that use this file.