File:400 KV electricity supergrid passes over Broadlands Lake, Nursling - geograph.org.uk - 698220.jpg

From Wikimedia Commons, the free media repository
Jump to navigation Jump to search

Original file(427 × 640 pixels, file size: 57 KB, MIME type: image/jpeg)

Captions

Captions

Add a one-line explanation of what this file represents

Summary[edit]

Description
English: 400 KV electricity supergrid passes over Broadlands Lake, Nursling These 400 KV lines carry about 450 MW of power towards Nursling substation (behind photographer), and 600 MW from Fawley power station towards Manningtree. The metal plates that hold each 4-cable line together are unusually coloured red.
Date
Source From geograph.org.uk
Author Peter Facey
Attribution
(required by the license)
InfoField
Peter Facey / 400 KV electricity supergrid passes over Broadlands Lake, Nursling / 
Peter Facey / 400 KV electricity supergrid passes over Broadlands Lake, Nursling
Camera location50° 56′ 40.1″ N, 1° 29′ 57″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo
Object location50° 56′ 40.8″ N, 1° 30′ 01″ W  Heading=292° Kartographer map based on OpenStreetMap.View this and other nearby images on: OpenStreetMapinfo

Licensing[edit]

w:en:Creative Commons
attribution share alike
This file is licensed under the Creative Commons Attribution-Share Alike 2.0 Generic license.
Attribution: Peter Facey
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
  • share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current04:12, 8 February 2011Thumbnail for version as of 04:12, 8 February 2011427 × 640 (57 KB)GeographBot (talk | contribs)== {{int:filedesc}} == {{Information |description={{en|1=400 KV electricity supergrid passes over Broadlands Lake, Nursling These 400 KV lines carry about 450 MW of power towards Nursling substation (behind photographer), and 600 MW from Fawley power stat

There are no pages that use this file.

Metadata